The driver of the mucking loading machine cleaned up the floating gangue (coal) in the roadway before handing over to the shift, and stacked all kinds of materials neatly.
When the rock mucking loader opportunity has large rocks or the rake bucket is blocked, the tunnel mucking machine bucket should not be forcibly pulled, and the rake should be pulled out 1~2m to preve
After regular inspection to make sure that the rock mucking loading machine is in good condition, open the lock, send the start signal, evacuate the personnel to a safe place, drive the empty car for
On September 5, a batch of fixed mine cart equipment was loaded in the intelligent equipment manufacturing workshop of China Coal Group and sent to Shanghai Port. The fixed mine cart shipped this time